Redesign Ops XDS · BLDgenerated 2026-08-26 23:04 from each project's PIPELINE.mdSetup kit
← All projects

Xcelerate Digital Systems

XDS DESIGN PAGES
BASHOMCAMSGWIRCPYPGSFIGDABLDNATPRECUTVERSTA
Staging
xcelerate-fable.vercel.app
Live site
xceleratedigitalsystems.com.au
Agency
XDS
Relationship
client
Last update
2026-08-25 (updated 1d ago)
Source
~/xcelerate-fable/PIPELINE.md

Pipeline to launch

  • BASELINE pending

    required before any cutover — XDS ranks for Newcastle local terms

  • CONCEPT HOME done · 2026-08

    done · 2026-08 · approved by Jack

  • CONCEPT APPROVAL done · 2026-08

    done · 2026-08 · approved by: Jack — own site, no external client

  • MESSAGE MAP done · 2026-08

    done · 2026-08

  • WIREFRAMES in progress · 2026-08-25

    OUTSTANDING · Applies to pages NOT YET BUILT only. web 1.25.0 (2026-08-25) moved the copydeck after the wireframe pick and made the homepage a production archetype. Run the gate per remaining archetype before building …

  • COPYDECK in progress

    OUTSTANDING · Follows each wireframe pick, one shot per archetype. See website-redesign references/page-wireframes.md Phase 3.

  • DESIGN PAGES in progress

    in progress · inner pages next

  • FIGMA pending

    approved design rebuilt as a componentised Figma file

  • DESIGN APPROVAL pending

    the design reference signed off — Figma file, Cloudflare build or CMS staging, whichever this project used

  • BUILD pending

    built in the target CMS (Beaver Builder / Elementor / Webflow) via the bridge

  • NATIVISE pending

    raw-HTML sections converted to native, client-editable CMS modules

  • PRE-FLIGHT pending

    launch checklist: redirects, forms, tracking, 404s, performance

  • CUTOVER pending

    DNS / hosting flipped — the new site goes live

  • VERIFY pending

    seo-preservation VERIFY: re-crawl vs baseline, every old URL 301s, rankings re-checked. Done = confirmed live

Post-live

  • STABILISE pending

    2–4 week watch: GSC coverage, 404s, rankings vs baseline — after this the website is complete and it's maintenance from here

Not applicable to this project: DIAGNOSE

Where it's at

Homepage approved; inner pages next.