required before any cutover — XDS ranks for Newcastle local terms
done · 2026-08 · approved by Jack
done · 2026-08 · approved by: Jack — own site, no external client
done · 2026-08
OUTSTANDING · Applies to pages NOT YET BUILT only. web 1.25.0 (2026-08-25) moved the copydeck after the wireframe pick and made the homepage a production archetype. Run the gate per remaining archetype before building …
OUTSTANDING · Follows each wireframe pick, one shot per archetype. See website-redesign references/page-wireframes.md Phase 3.
in progress · inner pages next
approved design rebuilt as a componentised Figma file
the design reference signed off — Figma file, Cloudflare build or CMS staging, whichever this project used
built in the target CMS (Beaver Builder / Elementor / Webflow) via the bridge
raw-HTML sections converted to native, client-editable CMS modules
launch checklist: redirects, forms, tracking, 404s, performance
DNS / hosting flipped — the new site goes live
seo-preservation VERIFY: re-crawl vs baseline, every old URL 301s, rankings re-checked. Done = confirmed live
2–4 week watch: GSC coverage, 404s, rankings vs baseline — after this the website is complete and it's maintenance from here
Not applicable to this project: DIAGNOSE