done · 2026-08 · live on staging, awaiting client approval
in progress · 2026-08-04 · with the prospect since ~2026-08-04. approved by: <pending — prospect>
done · 2026-08
OUTSTANDING · Applies to pages NOT YET BUILT only. web 1.25.0 (2026-08-25) moved the copydeck after the wireframe pick and made the homepage a production archetype. Run the gate per remaining archetype before building …
OUTSTANDING · Follows each wireframe pick, one shot per archetype. See website-redesign references/page-wireframes.md Phase 3.
AgencyViz widget deferred
in progress · with prospect since ~2026-08-04. Blocked behind the inner pages: this gate needs a COMPLETE page set and only the homepage exists
built in the target CMS (Beaver Builder / Elementor / Webflow) via the bridge
raw-HTML sections converted to native, client-editable CMS modules
launch checklist: redirects, forms, tracking, 404s, performance
DNS / hosting flipped — the new site goes live
seo-preservation VERIFY: re-crawl vs baseline, every old URL 301s, rankings re-checked. Done = confirmed live
2–4 week watch: GSC coverage, 404s, rankings vs baseline — after this the website is complete and it's maintenance from here
Not applicable to this project: DIAGNOSE · BASELINE · FIGMA