Redesign Ops XDS · BLDgenerated 2026-08-26 23:04 from each project's PIPELINE.mdSetup kit
← All projects

Chop n Drop

XDS PROSPECT COPYDECK WITH PROSPECT
DIAHOMCAMSGWIRCPYPGSFIGDABLDNATPRECUTVERSTA
Staging
chop-n-drop.pages.dev**
Live site
chopndroptreespecialists.com.au
Agency
XDS
Relationship
prospect
Last update
2026-08-25 (updated 1d ago)
Source
~/chop-n-drop/PIPELINE.md

Pipeline to launch

  • DIAGNOSE done · 2026-08-18

    DONE 2026-08-18 — ~/Business/clients/chop-n-drop/seo-audit/2026-08-18/AUDIT.md. Rankings rechecked 2026-08-25 (../2026-08-25/RECHECK.md): positions flat, but PBN link acquisition is ONGOING (spam-anchor referring …

  • CONCEPT HOME in progress

    STOPPED HERE — awaiting Jack/client approval

  • CONCEPT APPROVAL in progress

    in progress — awaiting sign-off. approved by: <pending>

  • MESSAGE MAP done · 2026-08-18

    DONE, gate approved by Jack 2026-08-18

  • WIREFRAMES in progress

    OUTSTANDING — not yet run

  • COPYDECK in progress

    OUTSTANDING — not yet run

  • DESIGN PAGES pending

    every inner page designed to the approved direction

  • FIGMA pending

    approved design rebuilt as a componentised Figma file

  • PROSPECT APPROVAL pending

    the design reference signed off — Figma file, Cloudflare build or CMS staging, whichever this project used

  • BUILD pending

    built in the target CMS (Beaver Builder / Elementor / Webflow) via the bridge

  • NATIVISE pending

    raw-HTML sections converted to native, client-editable CMS modules

  • PRE-FLIGHT pending

    launch checklist: redirects, forms, tracking, 404s, performance

  • CUTOVER pending

    DNS / hosting flipped — the new site goes live

  • VERIFY pending

    seo-preservation VERIFY: re-crawl vs baseline, every old URL 301s, rankings re-checked. Done = confirmed live

Post-live

  • STABILISE pending

    2–4 week watch: GSC coverage, 404s, rankings vs baseline — after this the website is complete and it's maintenance from here

Not applicable to this project: BASELINE

Where it's at

Nothing — stopped at the homepage approval gate. Next session: on approval, build remaining pages per sitemap in the same system, then wire AgencyViz campaign at full-site point.