done · 2026-08-24 · seo-preservation/baseline/BASELINE.md. 27 URLs, homepage #3 for "digital marketing agency newcastle" is the asset. GSC NOT connected for this domain (gap — fix before cutover).
done · 2026-08-24 · Direction B approved by Jack. Sales asset; approval was of DIRECTION
done · 2026-08-24 · approved by: Jack — Direction B chosen over Direction A. Internal project, no external client at this gate
done · 2026-08 · written up front via copy:copyos; proof questions still open at the foot of COPY.md
3/3 page archetypes picked: service page — APPROVED 2026-08-25: Opt 1 Chapter + Opt 2 ledger moves (stars in hero, ledger rows, phone-as-proof on social — phone later replaced by CaseRail, Jack same day); tone rhythm — …
INCOMPLETE — needs a check · Predates web 1.25.0 (2026-08-25), which moved the copydeck after the wireframe pick. No record either way, so it is NOT claimed as done and NOT written off as n/a. Re-run …
full site built · 2026-08-24 · Direction B approved by Jack; all 27 URLs live on CF Pages, awaiting full-site review, then AgencyViz wiring (Phase 7.3).
approved design rebuilt as a componentised Figma file
the design reference signed off — Figma file, Cloudflare build or CMS staging, whichever this project used
built in the target CMS (Beaver Builder / Elementor / Webflow) via the bridge
raw-HTML sections converted to native, client-editable CMS modules
launch checklist: redirects, forms, tracking, 404s, performance
DNS / hosting flipped — the new site goes live
seo-preservation VERIFY: re-crawl vs baseline, every old URL 301s, rankings re-checked. Done = confirmed live
2–4 week watch: GSC coverage, 404s, rankings vs baseline — after this the website is complete and it's maintenance from here
Not applicable to this project: DIAGNOSE