Redesign Ops XDS · BLDgenerated 2026-08-26 23:04 from each project's PIPELINE.mdSetup kit
← All projects

Big Boyz Binz

XDS DESIGN APPROVAL WITH CLIENT
DIABASHOMCAMSGWIRCPYPGSFIGDABLDNATPRECUTVERSTA
Staging
big-boyz-binz.pages.dev
Live site
bigboyzbinz.com.au
Agency
XDS
Relationship
client
Last update
2026-08-25 (updated 1d ago)
Source
~/big-boyz-binz/PIPELINE.md

Pipeline to launch

  • DIAGNOSE incomplete — needs a check

    INCOMPLETE — needs a check · No audit on record in this file. Sister brand of Tropical Skips; run marketing-audit:seo-audit or record N/A with a reason

  • BASELINE incomplete — needs a check

    INCOMPLETE — needs a check · No seo-preservation SNAPSHOT on record. The live site is real (bigboyzbinz.com.au), so this is a genuine gate before any cutover, not an n/a

  • CONCEPT HOME done · 2026-08-03

    done · 2026-08-03 · Jack approved the homepage the same day the full site went up. Hero reworked per his note

  • CONCEPT APPROVAL done · 2026-08-03

    done · 2026-08-03 · approved by: Jack — same day. Predates the named gate; recorded retrospectively from the note above

  • MESSAGE MAP done · 2026-08-25

    done · 2026-08-25 · COPY.md approved by Jack 2026-08-25, one amendment (borrow Tropical's operational numbers, never its review count). Written AFTER the build and reconciled to it via RECONCILE.md, all 8 findings …

  • WIREFRAMES incomplete — needs a check

    INCOMPLETE — needs a check · Predates the gate (web 1.20.0+). No archetype picks recorded

  • COPYDECK incomplete — needs a check

    INCOMPLETE — needs a check · Predates web 1.25.0. Copy was authored inside components during the build, then reconciled backwards — see the Copy deck section below

  • DESIGN PAGES done · 2026-08-03

    done · 2026-08-03 · 7 pages + suburb pages. All 200s, no JS errors, no h-scroll at 375/1440, em-dash-free. 3 iteration passes done

  • FIGMA pending

    Optional, not started

  • DESIGN APPROVAL in progress · 2026-08-03

    in progress · 2026-08-03 · Campaign cae31e20-1848-40df-bbe9-6512dde81778, 7 webpage assets at client_review. Awaiting client review

  • BUILD pending

    Old site is WordPress + Beaver Builder, so web:html-figma-to-beaver. Not started

  • NATIVISE pending

    Not started

  • PRE-FLIGHT pending · 2026-08-12

    Not started. Open from the 2026-08-12 retrofit check: structured data (LocalBusiness + FAQPage), full WCAG pass, favicon/OG confirmation

  • CUTOVER pending

    Not started

  • VERIFY pending

    Blocked on BASELINE above: with no snapshot there is nothing to diff against

Post-live

  • STABILISE pending

    2–4 week watch: GSC coverage, 404s, rankings vs baseline — after this the website is complete and it's maintenance from here

Where it's at

State: FULL SITE BUILT + AgencyViz wired, awaiting client review